As a result of reconstruction of the house, the customer has the opportunity to receive an updated building, maximally adapted to his individual requirements. In addition, the reconstructed house has extended service lines and higher rates of living comfort. Significantly reduced the cost of its maintenance. During the execution of works, modern materials and technologies are used, which allows achieving the maximum effect while significantly reducing the estimated cost of construction and installation work.
STAGES OF RECONSTRUCTION OF HOUSES
Full reconstruction of the facility is a complex of complex construction and installation works that require high qualification of the performer. The list of required activities includes:
- A complete survey of the current state of the building and utilities. These data have a great influence on the choice of plan and methods of reconstruction.
- Compiling a working draft. During the preparation of the project, the wishes of the customer are taken into account to the maximum extent, unless they conflict with the current SNiPs and state standards.
- Selection of building materials and development of estimates for the reconstruction. The data are agreed with the customer, if necessary, he makes his changes and comments.
- After the customer approves the estimate and concludes an agreement with him, the construction company proceeds to fulfill the order. The customer has the right to monitor the progress of work. It is allowed to make some changes, if these changes do not contradict the work already completed.
After the order is completed, acceptance procedures are carried out in the presence of the customer, the contractor and, if necessary, representatives of state regulatory organizations. ionosfera has extensive practical experience in handling the most complex cottage renovation orders. Diverse specialists of the company are able to carry out construction from the stage of development of documentation and to the commissioning of the facility on a turnkey basis.